- Software[10]
- Other Analysis Instruments[6]
- Drilling Rig[8]
- Other Mining Machinery[10]
- Educational Equipment[10]
- Other Machinery[10]
- Testing Equipment[2]
- Contact Person : Ms. Luo Joyce
- Company Name : Chengdu EsimTech Petroleum Equipment Simulation Technology Exploitation Co., Ltd.
- Tel : 86-028-83037533
- Fax : 86-028-83037533
- Address : Sichuan,Chengdu,Xindu Avenue 8,Xindu,Chengdu,Sichuan,China
- Country/Region : China
- Zip : 610500
Gas Production Simulator
System main goal:
1. Provide instructions and training in gas rig technique and theory for technicians and students majored in Oil-Rig.
2. Provide operational practices for technicians and employees.
3. Provide training for students with demonstration experiments, operational practice and technique learning and operation in the courses of gas rig Technique Theory and oil gas Practice.
4. Provide 2D/3D real-time working flow.
Training Function :
1)Wellhead operation
2)Apparatus operation
3)Pig operation
4)Normal operation
Figure 1 System Framework of Hardware
Configuration: (As per one set) :
Gas control panel
The gas control panel controls the valves and devices in the gas-collection system. The console consists of the following panels: low pressure gas well control panel, high pressure gas well control panel, heater control panel, three-phase separator control panel, flow-meter control panel, pressure-release panel, pig sender control panel, pig receiver control panel, foaming agent injection control panel, de-foaming agent injection control panel. All parameters are calculated real-time, and are consistent with working site.
Graphics Projecting Unit
Graphics are projected onto wall in displaying field scenery. Two kinds of Graphics Projecting Unit are available. One is ordinary projecting unit. It features low price but less attractive environment. The other applies virtual reality technology in Drilling Simulator.
SYSTEM SOFTWARE :
The system software is Windows style which is convenient for user and system administrator, which consists of 2 parts, including 2D work flow interface and 3D equipment status interface. The console panel control equipment state of the graphics software, the main control software in real time to calculate the flow state of each pipeline.
SYSTEM ADMINISTRATOR FUNCTIONS :
1. Simulate and set environmental parameters in gas rig operation.
2. Hardware self-check: check one-time gauges and operators of designated console to confirm abnormal objects.
OPERATOR FUNCTION :
(1) Wellhead operation
1) Gas well opening
2) Gas well shut-in
3) Pump in foaming agent
4) Pump in anti-freezing agent
5) Add corrosion inhibitor
6) Gas lift of intermittent producing well
7) Gas lift of flooding well
8) Stop lifting and shut-in for gas-lifting well
(2) Apparatus operation
1) Start water jacket heater
2) Stop water jacket heater
3) Start self-actuated pressure regulating valve
4) Shut-off self-actuated pressure regulating valve
5) Separator cleaning
6) Start flow-meter
7) Stop flow-meter
(3) Pig operation
1) Pig sending
2) Pig receiving
(4) Normal operations
Gas Production Simulator